archive-ru.com » RU » S » SPBEC.RU

Total: 206

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • Проекты / Construction of electrical substation on 150 kV to Kirovsk for JSC Apatit
    gallery Corporate identity News SPBEC celebrated its 19th anniversary Events New horizont and a new brand CAREERS Our values Internship Job vacancies Success stories Internship Welcome to the team Job vacancies Project Manager job opening CONTACT US Tel 7 812 331 96 20 info energy spb ru Contact us All contacts Worldwide Russia Español All projects Construction of electrical substation on 150 kV to Kirovsk for JSC Apatit JSC Apatit 2016 More Close Results The new powerful substation is constructed Uninterrupted operation of The joint Kirov mine is ensure Project description On November 30 2015 employees of SPBEC put into service the 150 kV new electrical substation for JSC Apatit The necessity of construction of new substation was caused by the carried out large scale reconstruction of The joint Kirov mine Capacity of object increased and energy consumption respectively grew It appeared capacities of the existing substations of Kirovsky district of power supply networks of JSC Apatit insufficiently for ensuring the growing energy consumption of a mining complex of mine The active phase of construction of substation Kirovski began in July 2014 Work flow Design Preparation of a platform of construction Earthwork Works of a zero cycle Works are higher

    Original URL path: http://www.spbec.ru/en/projects/catalog/construction-of-electrical-substation-on-150-kv-to-kirovsk-for-jsc-apatit/ (2016-04-30)
    Open archived version from archive


  • Проекты / Hardware-software complex of “Plavka” APCS (HSC of “Plavka” APCS) for Cherepovets Steel Mill
    of Plavka APCS for Cherepovets Steel Mill Facility Severstal OJSC Cherepovets Cherepovets Steel Mill Steel industry Electrical steel melting workshop More Close Project implementation results Reduction of melting time and utility consumption Reduction of semiproduct production cost Accurate melting process performance Project description HSC of Plavka APCS is designed to automatize melting process in three 450 ton converters in order to optimize the melting process reduce costs and improve technical and economic performance of steelmaking process The developed and put into operation HSC of Plavka APCS automatically controls the converter melting process from lancing to oxygen cutoff including all melt sampling operations controls solids supply line lance position lancing rate per working lance measuring lance movement creates delivers and executes commands for measurement of carbon concentration in the melt and its temperature when the set value is achieved creates delivers and executes the afterblow command to reach the set complete fusion melting point performs visualization and archivation of melting parameters HSC of Plavka APCS is based on the synthesis of process balance dynamic and statistical models The number of process models herewith may exceed ten It has a process models constructor that quickly responds to newly developed special steels with

    Original URL path: http://www.spbec.ru/en/projects/catalog/hardware-software-complex-of-plavka-apcs-hsc-of-plavka-apcs-for-cherepovets-steel-mill/ (2016-04-30)
    Open archived version from archive

  • Проекты / Reconstruction of the heating and hot water supply systems and construction of modular electric boiler of OJSC APATIT in Koashva
    the heating and hot water supply systems and construction of modular electric boiler of OJSC APATIT in Koashva More Close Project implementation results High energy performance with about 99 efficiency of boiler High ecological performance by avoiding residual fuel oil Cost effectiveness provided by remote control of automation Project description A unique automation package controls all operation modes and maintains heat supply throughout the heating season with little or no human intervention The facility is unique for the Murmansk region few cities have such facilities said Roman Bulankin Chief Power Engineer of Apatit JSC The facility provides Koashva objects with heating and hot water and reduces the thermal load on the existing boiler of Vostochny mine Technical and economic parameters of the electric boiler Established heat capacity is 6 93 MW Heating boiler supply security is of first category item 4 8 SP 89 13330 2012 Combustion boiler systems of heating generation The boiler room provides heat to consumers of second category of supply security The boiler has a closed heat balance with boiler and power circuit divided by plate heat exchangers The heat balance provides 1 Supply of thermal liquid of 105 70 C for heating and hot water

    Original URL path: http://www.spbec.ru/en/projects/catalog/reconstruction-of-the-heating-and-hot-water-supply-systems-and-construction-of-modular-electric-boil/ (2016-04-30)
    Open archived version from archive

  • Проекты / Underground train automated control, alarm, signals and interlocking, blocking system
    alarm signals and interlocking blocking system Facility Kola MMC OJSC Severny Glubokiy mine 320 m level Zapolyarny town Customer Kola MMC OJSC Year 2014 More Close Project implementation results Accurate real time determination of moving trains position at the level within 5 m Traffic safety and haulage control in manual and automatic modes Project description In 2014 at Severny mine of Kola MMC OJSC a project for the construction of underground train automated control alarm signals and interlocking blocking system was implemented by the mining department specialists under the leadership of project manager A V Myasnikov and chief engineer of the project E R Otitskiy The mine signaling arrangement developed in the 1970s and used until recently did not allow to carry out electric haulage in compliance with the necessary security requirements In this regard a new innovative solution that would achieve greater safety improve technical and economic indicators of operation of the underground railway transportation and would also provide a complex automated processing of information on ore transportation was required Thanks to professionalism of programmers A V Makarov D V Pirog I R Mulyukov and engineers D V Lazarev V V Kalina the problem was solved The results The

    Original URL path: http://www.spbec.ru/en/projects/catalog/underground-train-automated-control-alarm-signals-and-interlocking-blocking-system/ (2016-04-30)
    Open archived version from archive

  • Проекты / Installation of pipe deovalization UDC 200
    CAREERS Our values Internship Job vacancies Success stories Internship Welcome to the team Job vacancies Project Manager job opening CONTACT US Tel 7 812 331 96 20 info energy spb ru Contact us All contacts Worldwide Russia Español All projects Installation of pipe deovalization UDC 200 A new deovalizator a device for adjusting the oval pipe ends was installed at Izhora Pipe Mill Facility Severstal OJSC Izhora Pipe Mill More Close Project implementation results This project is unique It is one of a kind equipment so far The equipment is designed for use at the production line Time transients effectiveness Project description This is a unique automated high power press designed to fix roundness of the ends of the longitudinal welded pipes of large diameters ranging from 610 mm to 1420 mm wall thickness from 7 mm to 48 mm and strength grade X52 H56 X60 X65 X70 X80 according to API Specification 5L It is one of a kind equipment so far The press was developed for the first time jointly by engineers of SPA SPbEC LLC and designers of Special Design Bureau of Heavy Unique Machines The press is 5 axis with a variety of sensors from inductive

    Original URL path: http://www.spbec.ru/en/projects/catalog/installation-of-pipe-deovalization-udc-200/ (2016-04-30)
    Open archived version from archive

  • Проекты / Turnkey construction of a sawmill
    team Job vacancies Project Manager job opening CONTACT US Tel 7 812 331 96 20 info energy spb ru Contact us All contacts Worldwide Russia Español All projects Turnkey construction of a sawmill The single line sawmill on the basis of chipper canter circular profiling line Megaline 3PKA produced by SAB In the sawmill building there is SAB palletizer for center boards BSA N50 GOST boards grade line administrative and auxiliary integrated premises Facility Velskiy Woodworking Plant LLC Year 2013 2014 More Close Project description Sawmill structure SАВ lumber grading line SАВ chipper canter sawing line and green lumber grading line Chips sawdust and bark bins Fire pump station with reservoirs Utility networks Transformer substations SPbEC company completed the following construction and installation works at the site Piling Monolithic concrete foundations laid Installation of metal structures Installation of glued wood joints Installation of roof and wall sandwich panels Filling of openings windows doors gates Installation of heating and ventilation systems Installation of electrical equipment Utility networks laying Construction of boiler houses and pumping stations landscaping Technical and economic performance Production capacity of raw material sawing sawmill is 320 000 m 3 per year with a 2 shift system The number

    Original URL path: http://www.spbec.ru/en/projects/catalog/turnkey-construction-of-a-sawmill/ (2016-04-30)
    Open archived version from archive

  • Проекты / APCS of trommelling site of Plant No. 14 of Aikhal Mining and Processing Division, AK ALROSA
    team Job vacancies Project Manager job opening CONTACT US Tel 7 812 331 96 20 info energy spb ru Contact us All contacts Worldwide Russia Español All projects APCS of trommelling site of Plant No 14 of Aikhal Mining and Processing Division AK ALROSA OJSC AK ALROSA Aykhal Mirny Yakutia More Close Project implementation results Maximum performance at minimum energy cost Improvement in accident prevention in mined rock processing Project description In late December 2008 the pre commissioning activities for trommelling site APCS of Plant No 14 of Aikhal Mining and Processing Division Aykhal settlement of AK ALROSA were finished Due to modernization of the existing automation systems and replacement of the outdated systems with modern software and hardware complex and equipment as well as in view of increasing production capacity a demand for the mentioned works appeared According to the results of the project the plant will be able to meet the estimated and abnormal requirements of diamond mining The first stage of automation ended in 2007 with the introduction of APCS of ore dressing site and bunkering centers The results of this work provided the basis for master s theses of our plant production engineers The software and

    Original URL path: http://www.spbec.ru/en/projects/catalog/apcs-of-trommelling-site-of-plant-no-14-of-aikhal-mining-and-processing-division-ak-alrosa/ (2016-04-30)
    Open archived version from archive

  • Проекты / ASODU of "Mir" minery of Mirny Mining & Processing Division of AK Alrosa
    Español All projects ASODU of Mir minery of Mirny Mining Processing Division of AK Alrosa Customer AK Alrosa More Close Project description On August 21 2009 an automated system for operational dispatch management ASODU was put into operation at Mir minery of Mirny Mining Processing Division The overall structure of the project implementation was divided into three main areas Central Dispatch Service System CDS Automatic fire suppression system FSS Emergency

    Original URL path: http://www.spbec.ru/en/projects/catalog/asodu-of-mir-minery-of-mirny-mining-processing-division-of-ak-alrosa/ (2016-04-30)
    Open archived version from archive